---
title: "The Speedgoat trail: singletrack built by Speedgoat Trail Co"
description: "A mile of singletrack built by Evan Ely of Speedgoat Trail Co in May 2026: the build video and a daily ledger of rides on it, with miles, climbing and routes."
url: https://imaginarytrout.com/speedgoat/
---

Speedgoat Trail

# A mile of singletrack, out the back door.

In May 2026, Evan Ely of Speedgoat Trail Co built a mile of flowing singletrack at Imaginary Trout HQ. Another mile is planned for 2027. We ride it all season, and the numbers below come straight off the bike.

- **1** mile built, May 2026
- **+1** mile planned, 2027
- Machine-cut, hand-finished

01 / The build

## Watch it go in.

Evan's own film of the build, from flagging the line to the first laps.

02 / The ride ledger

## Every ride, no map.

Pulled from Trout's Garmin once a day. Rides show up a day later, by week, with every location detail removed. Choose any ride for all of its numbers.

–Miles

–Feet climbed

–Feet descended

–Rides

- **–**Hours in the saddle
- **–**Calories
- **–**Longest ride
- **–**Biggest climb

Loading the rides.

Trail log

Scroll through the routes over time

The rides

Rides, newest first. Choose a ride to see all of its numbers.

Week

Ride

Distance

Time

The ride list loads with JavaScript.

Routes are drawn from the ride files with every coordinate removed and the drawing turned, so they cannot be lined up with a real map.

03 / The builder

## Meet Evan Ely.

Evan grew up building jumps in the woods and found he cared more about drainage and flow than tricks. He holds a degree in architectural design, went pro in 2019, and has hand-built remote sections of the Colorado Trail near 12,000 feet.

He runs Speedgoat Trail Co from Wyoming, designing and building trails for land managers, towns, resorts and private landowners. The name comes from the pronghorn, the fastest land animal in North America. Evan drew the speedgoat himself, and his stickers are all over IT HQ. We're building his new website.

[Visit speedgoattrailco.com (opens in a new tab)](https://speedgoattrailco.com/) [Speedgoat on Instagram (opens in a new tab)](https://www.instagram.com/speedgoat_trailco/)

### In his own words

- - ## Trail questions

### 

Evan Ely of Speedgoat Trail Co. He designs, builds and maintains trails for land managers, towns, resorts and private landowners, working with small machines and by hand.

### 

Yes. Private and ranch trail systems are part of what Speedgoat Trail Co does, from a short loop that takes a couple of days to a network built in phases. Get in touch with Evan through his website.

### 

The trail is on private land, and we want to keep it that way. The ride shapes are drawn from the ride files with every coordinate removed and the drawing turned, so they cannot be lined up with a real map. Rides show up a day after they happen, by week.

### 

From Trout’s Garmin, once a day. Our server reads each ride, keeps the distance, time, climbing and descending, calories, bike and mountain bike scores, and throws away the location and heart rate before anything is stored.

### 

Two mountain bike scores from Garmin. Grit rates how hard a ride was, from the climbing, the terrain and the speed; higher is harder. Flow rates how smoothly you rode the descents and corners; lower is smoother.

## Want a site that holds up like good singletrack?

Evan builds the trails. We build websites and software that drain well, ride smooth and last. Tell us what you need.

[Start a project](https://imaginarytrout.com/contact/)

![](/brand/logos/trout-sticker.svg)

---

Imaginary Trout, Laramie, Wyoming. Start a project: https://imaginarytrout.com/contact/ · hello@imaginarytrout.com · 480-463-4202 (leave a message)
